contestada

​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

a garden hose faucet is able to fill a gallon container in 20 seconds. A homeowner accidentally left his hose on for a full day. How many gallons per day can a
Improperly digested nutrients may indicate a problem of which tissue layer
how hot does the sun get?
If the Nile ceased to flow, what did the Egyptians believe would happen?
Which of the following were invented during the high Middle Ages
Which of the following was made possible by the Fourteenth Amendment? State governments were able to pay back money owed after the war. State governments had
The circumference of the circle in the above figure is 128 ft. What is the length of AB? A. 45 ft B. 16 ft C. 105.5 ft D. 22.5 ft
Sv02 change before you start slowing the draw time on your mixed venous sample 4%
Alyssa received $30,000 from an inheritance and invests part in a certificate of deposit (CD) paying 5% annual interest and the rest in Apple Inc. off
Janice thinks that 20 hundredths is equivalent to 2 thousandth because 20 hundred is equal to 2 thousand is that correct