A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Which of the following is not a result of heavy use of irrigation water? A. Leaching of nutrients B. Increase in salt concentration of the soil C. Increase in s
find the sum to the equation of:
What differentiates baseline activities from health-enhancing activities?
The average length of a female white-beaked dolphin is about 111 inches. What is this length in feet and inches? A) 9 feet 2 inches B) 9 feet 3 inches C) 10 fee
Sarah has going to work for 60 days. On 39 of those days she arrived at work before 8:30 AM. On the rest of the day she arrived after 8:30 AM. What is experimen
When did the Dell Inspiron 11 come out?
What is the climate like in the Himalayas, India?
What is the synonym for discussion
Why can't our body resist radiation?
Who was Henry II? A. the king who led the Normans in their conquest of England B. the king who established a new system of justice in England C. the king who le