Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete

Respuesta :

connerb333 connerb333
  • 08-07-2020
All of these are correct and what Would work best is a % Complete_ at what this would do is show a 0-100 completion rate
Answer Link
babyyyjadee babyyyjadee
  • 30-10-2020
All of them would work but the most efficient one would be % complete
Answer Link

Otras preguntas

Compute the odds in favor of rolling a sum of 10 in a single roll of two fair dice
2-3 facts about Warsaw Pact
Write a complete reaction of succinic acid and acetic anhydride
List all integers between -0.6 and 4.17 THANK U
which of the following expressions does not equal: the sixth root of 81x^4y^8 a. (3xy^2)^2/3 b. (3x)^2/3y^4/3 c. (3x^2y^4)^1/3 d. cube root of 9x^2y^4
wats the 60% off a prize that is $20.00
A graph depicts force versus position. What represents the work done by the force over the given displacement? A. The work done is equal to the product of the m
Hey, need some help reverent A. respectful B. respect C. reply D. to spoil
The Habsburg Empire did all of the following EXCEPT A. take control of Hungary, Croatia, and Slovonia. B. lose their Holy Roman Empire in Germany. C. remain a c
What is the probability of someone correctly guessing your Social Security number? (Assume all digits 0-9 are available for use)a