When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

Please help I don’t understand this one
Which would the FCC most likely penalize for violating a regulation?
Which method is the most efficient method to use to solve x^2+4x+3=0
How does an increase in the amount of charge on an object affect the electric field strength created by the object?
Who was the head of the war industries board
7+12+21+34 Please find the mean!
BRAINLEST please help 1. Engineering makes predictions about what will happen in a given circumstance. -True -False 2. Why is the Industrial Revolution simi
Which is the topic sentence of the following paragraph? Can you imagine taking a cross-country trip with your baby sister? The trip was fun because each member
Find the height of a square pyramid that has a volume of 25 3/5 meters and a base with 4 meter sides
In which kind of economic system does the government control the business that effect more citizens,such as railroads and electronically power