What is the preferred approach to risk mitigation?

-Tolerate
-Transfer
-Terminate
-Treat

Respuesta :

oeerivona oeerivona
  • 08-01-2021

Answer:

The correct option is;

Terminate

Explanation:

Termination of the risk is equivalent to elimination of the risk by avoiding the activity that brings about the risk or by using a different process that does not include the risk observed in the previous process option

When the reward far outweigh the risk, it may be decided to terminate or eliminate the risk and miss the reward and also terminate the likelihood of the losses to be incurred.

Answer Link

Otras preguntas

how does altitude affect climate patterens in a region
Relating to special services
Two doves upon the selfsame branch, Two lilies on a single stem, Two butterflies upon one flower:— O happy they who look on them. Who look upon them hand in han
The diagram shows an empty tank in the shape of a horizontal prism of length 150 cm.The cross section of the prisin is an isosceles trapezium ABCD.AB= 50cm, CD-
evaluate the expression 5 square minus (3 square+4)
How does AC in circleE relate to DF in circleF?
Simplify 4 + (−3 − 8)
Conjecture about the properties that change and the properties that stay the same when creating quadrilaterals that are not parallelograms. Check all that apply
WILL MARK BRAINLIEST! Which of the following is NOT considered a hazardous waste? A. bug spray B. fertilizer C. nail polish remover D. pesticides
What is the maximum number of y-intercepts a line can have? I will mark brainliest!