azharkareem2340 azharkareem2340
  • 01-03-2021
  • Mathematics
contestada

It takes 2 workers 6 days to paint a mansion. How many days would it take 4
workers to do the same job?

Respuesta :

dontmindme3
dontmindme3 dontmindme3
  • 01-03-2021

Answer:

2 workers = 6 days

4 workers = 3 days

Step-by-step explanation:

If it takes 2 workers 6 days, if you seep up the process with 4 workers, you would divide the days by 2 because you multilpied the workers by 2. So, it would take 3 days with 4 workers. I hope that makes sence.

Answer Link

Otras preguntas

HELP Please!Read and choose the correct option to complete the sentence. Juanita y yo bajábamos por rápidamente. (1 point) la cuerda Oь la rayuela el tobogán el
Does anyone know this?!?
find the value of a and b​
What fraction is equal to 50% of 1/3 help pls
When writing a headline, which of the following is the LEAST important? a. being clever b. accuracy c. fitting the space d. being concise
The perimeter of an isosceles triangle is 45cm.Find the length of the third side,if each of the equal sides is 14cm long. Please help!!!!
Select the correct answer from each drop-down menu. Hamilton introduced the idea of . With the goal of .
a rectangle is both a polygon and quadriteral
A horseshoe magnet is moved toward a pile of iron shavings. The iron shavings divide and attach to both ends of the magnet. How does the kinetic energy of the s
Briefly explain why you have two of every gene.