PLEEASE ANWER QUICK: The project manager is writing the requirements document. Which phase of the project life cycle is he in?
project closure
project planning
project initiation
project execution ​

Respuesta :

Animmango
Animmango Animmango
  • 01-05-2021

Answer:

I think, project execution. He is writing the requirements document. which mean it doesn't project closure and initiation. then he did it which mean it doesn't project planning.

Answer Link

Otras preguntas

How much work is done by the force lifting a 0.1-kilogram hamburger vertically upward at constant velocity 0.3 meter from a table? (1) 0.03 J (3) 0.3 J (2) 0.1
Which sentence uses correct punctuation? A. Dad thought we should have hamburgers for the cookout, Mom wanted chicken. B. Dad thought we should have hamburge
What is the solution to the proportion? 12/15 = 8/x (Solve for x.) A. 10 B. 12 C. 9 D. 16
please i need help on #7
After World War I, a “return to normalcy” was most clearly demonstrated by (1) opposition to joining the League of Nations (2) ending farm subsidies under the A
How did Seamus Heaney incorporate Old English poetry elements in this modern translation?
when a male sage grouse can be seen inflating and singing loudly to a female sage grouse this is an example of
A submarine can descend at a rate of -2.5 meters/second. Suppose that the submarine begins at a depth of -25 meters. How long would it take the submarine to
How does the human body use its own chemical defences to prevent infection
The value in dollars, v(x), of a certain car after x years is represented by the equation v(x) = 25,000(0.86)^x. To the nearest dollar, how much more is the car