Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

Jayden has been reading a 275275275-page book for English class. On average, he has read about 101010 pages in 151515 minutes (\text{min})(min)left parenthesis,
a gardener can plant 17 seeds in 25 minutes at that rate how long will it take him to plants 51 seeds
Who is Nicolas Flamel from Harry Potter? (What made him special?)
Who is considered the founder of psychosocial theory? jean piaget sigmund freud erik erikson peter blos?
Assume the method dosomething has been defined as follows: public static void dosomething (int[] values, int p1, int p2) { int temp = values[p1]; values[p1] = v
One species of fish feeds in the muddy bottom of a lake. a second species eats insects that land on the water surface. this is an example of
an example of a Destructive force is the formation of mountains True or False?
what are the inner planets relative distance from the Sun
Name three documents the deal with the evolution of parliamentary democracy
Which of the following conclusions is supported by the map? A. Central European countries are more populated than western European countries. B. The least p