mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

Calculate the age of the following person for insurance purpose on the given date. Mahammad Houtman, who was born December 28, 1934, is how old on June 2, 1978?
Iodine-131 is used to treat a hyperactive thyroid gland. the half-life of iodine 131 is 8.02 d. If a hospital receives a 215.25 g shipment of iodine 131, how mu
I need ans asap!!Find the sum of all sides of the following rectangle ​
the midpoint of line segement AB is M(2,-2). if the coordinates of A are (5,-6), what are the coordinates of B?
What is 0.048 written as a fraction?
is 84 feet in 12 seconds equivalent to 217 feet in 31 seconds
6. A train accelerates from rest with an acceleration of 4 m/s2 for a time of 20 s. What is the train’s speed at the end of 20 s? (A) 0.25 m/s (B) 4 m/s (C) 2.5
what's the best apk to get money ?​
Why does Johnny tell Ponyboy he could never use a gun?
Anthony spent ½ of his money on Saturday and ¼ on sunday.what is the fraction of his money is left​