henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

Two stars, star 1 and star 2 are at almost equal distances from earth Star 1- 3.61 mass of star Star 2- 3.59 mass of star Which stamens is correct A-Earth exe
Find all polar coordinates of point p where p = ordered pair 5 comma pi divided by 3.
Which of these is the best method to measure the distance of a star calculate the variations in the position of the star due to movement of Earth in its orbit m
What was one result of the War of 1812?
Define a simulation to represent correct answers on a true-or-false quiz. Use the simulation to find the probability of getting exactly 4 correct answers on a t
Franklin Delano Roosevelt's Infamy Speech December 8, 1941 "Yesterday, December 7, 1941—a date which will live in infamy—the United States of America was sudden
the people in a location in florida dug wells to reach the underground water source which of these is a correct conclusion about the location A. It has several
What happened after we discovered gold in Georgia in the 1820s?
A character who changes throughout a story is considered a ______. Static character Dynamic character Flat character Wishy Washy character
Determine the zeros of f(x) = x3 + 7x2 + 10x − 6