ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

Gaspar writes the algebraic expression 5b +3.79. It represents the total cost, in dollars, of buying 5 bagels and a container of cream cheese. Identify any vari
PLSS HELP MEEE!! It'll be very appreciated
How many solutions does the following equation have? -14(z-5) = -14z +70 Choose 1 answer: A. No solutions B. Exactly one solution C. Infinitely many solutions
1. Arc QR = Arc RS = 2. Find x and y -- if your answer is not a whole number, round to the tenths!
In how many ways can a person order one ice cream cone with 3 different flavors of ice cream if there are 14 flavors to choose from and it matters to the person
All are true about the American Revolution EXCEPT Many soldiers died from cold and disease at Valley Forge. The colonists did not receive any foreign aid during
A 16.0 kg canoe moving to the left at 10 m/s makes a head-on collision with a 19.0 kg raft moving to the right at 7.0 m/s. After the collision, the canoe moves
Solve each equation. |x+5|=-3
Solve the system of equations below by graphing. Type in the ordered pair (x,y) for your answer y=-2 x+y=5
In the diagram of a gate, the horizontal bars are parallel and the vertical bars are parallel. Find x and y. Complete the explanation Indicating which postulate