boand3
boand3 boand3
  • 04-05-2018
  • Mathematics
contestada

A construction company needs to remove 2 1/6 tons of dirt from a construction site. They can remove 7/8 tons of dirt each hour. What is the total number of hours it will take to remove the dirt?

Respuesta :

jupjupjupjup202 jupjupjupjup202
  • 04-05-2018
The answer is 4.

Hope I helped :)
Answer Link

Otras preguntas

Which word does not help create a tone o enthusiasm experience, unique, thrilling, legendary
Esta película NO se trata ________ A. de crimen. B. de amor. C. de arte.
Which monatomic ion has a charge of 1- and the condensed electron configuration [ne]3s23p6?
A relay race is 1/10 kilometer long. Four athletes will run an equal distance to complete de relay. How far does each athlete run?
what is 8.525 rounded to 2 decimal place????
Which phrase best describes the cause of earthquake ? a. plate movements along fault lines b. the ring of fire c. intense vibrations d. movement of earth's cru
yo some one help me plz
A patient comes in showing signs of severe depression. Dr. Jorgenson wants to order an EEG and hormone panel, while Dr. Frieden wants to set up a system of rew
What was the total production of gasoline and kerosene combined?
Please help! Find the value of X and then Find the angle measures.